|
|
System Design and Simulation
|
|
ONG Automation understands that time taken on system design and testing pays
dividends through minimising site timework and reducing the possibility of project
overrun.
|
|
When the design documents are signed off, ONG Automation produce system software
code and utilise simulation software to rigorously test its operational functionality.
This allows our clients to see their processes operating, as they would when incorporated
on site.
|
System Simulation
|
|
The VP Link Simulation gives our clients the opportunity to become familiar with
the precise operation of their systems prior to installation on site.
|
|
|
|
|